
Soyabean farm, Depalpur
Two dry bores by another contractor. Our resistivity survey moved the point 40 m east and struck a fracture zone at 585 ft.
640 ft
Depth
2.5" column
Yield

A look at the rigs we own and the bores they have completed — farms, colonies, factories and public works across Indore district.

Two dry bores by another contractor. Our resistivity survey moved the point 40 m east and struck a fracture zone at 585 ft.
640 ft
Depth
2.5" column
Yield

Low-noise drilling inside an occupied colony, completed in a single day with full site restoration and paved-area protection.
480 ft
Depth
3" column
Yield

Deep bore with MS casing and documented cutting logs for statutory approval, plus a matched submersible and starter panel.
1050 ft
Depth
4" column
Yield
Every photograph here is our own machinery on our own jobs — no stock imagery.

DTH rig at work
Farm plot · Live bore

Mast raised, ready to bore
Village site · Agricultural

Mast up, crew ready
Roadside site · Deep bore

Our own rig fleet
Own fleet · Ready to move

Rig on the move
Indore district

Two other contractors gave up on my field. Chetan bhai surveyed it again, shifted the point by forty feet and we hit water at 480. Bore is still running strong three summers later.
– Ramesh Patidar
Farmer · Depalpur

They quoted a per-foot rate, gave the bill for casing pipes, and the final amount matched the quote to the rupee. For our society of 48 flats that mattered more than anything.
– Anita Deshmukh
Secretary · Gandhi Nagar Society

Our factory bore had gone dry. Their team flushed and extended it in two days instead of drilling a new one — saved us close to a lakh.
– Sameer Jain
Plant Manager · Sanwer Road

Rig arrived the next morning, work finished the same evening, and they cleaned the whole compound before leaving. Very professional people.
– Vikram Chouhan
Homeowner · Aerodrome Road

Two other contractors gave up on my field. Chetan bhai surveyed it again, shifted the point by forty feet and we hit water at 480. Bore is still running strong three summers later.
– Ramesh Patidar
Farmer · Depalpur

They quoted a per-foot rate, gave the bill for casing pipes, and the final amount matched the quote to the rupee. For our society of 48 flats that mattered more than anything.
– Anita Deshmukh
Secretary · Gandhi Nagar Society
Survey, drilling, casing and pump — one accountable team, one quoted price.