The sequence
- Site visit and hydro-geological assessment
- Point marking and approach planning
- Rig and compressor setup, levelling
- Drilling with depth logging at each slab
- Casing lowering and sealing of the top zone
- Air-lift development and discharge testing
- Pump lowering, panel wiring and handover
How long it takes
Most domestic bores in Indore are drilled and cased in a single day. Deeper farm and industrial bores may run into a second day.
Talk to Chetan Solanki
Tell us your locality and plot size — you will get a likely depth range and a per-foot rate on the call.


